Project: High Crompton Primary School
Location: Oldham, England
Main contractor: Naturalight Systems Ltd
Specification: 1No 14,000mm (7,100mm each slope) x 3,400mm overall size, NLS dual-pitch 16mm FastLock structural steel canopy, constructed from 100mm x 100mm x 3mm steel box section uprights (4no at front, 2no at rear), cross ties, ridge section, ring beam and wall plate, 300mm x 300mm x 10mm base plates for bolting to concrete pads supplied by NLS, all steelwork to be shot blasted, zinc primed to inter zinc 72, all polyester powder coated paint finished to BS 6496 colour White.
Glazing Specification
16mm FastLock glazing system, factory assembled interlocking panels with secondary water management including aluminium flashings to suit, glazed with 16mm UV protected triple-wall polycarbonate colour tint Bronze.