Project: Ellison Boulters Academy (formerly Scothern Primary School)
Location: Scothern, England
Main contractor: HBS Services
Specification: 1No 15,000mm x 5,000mm x 2,700mm high to underside of ring beam, NLS independent mono-pitch FastLock structural steel canopy, constructed from 100mm x 100mm x 3mm SHS steel uprights, cross ties and ring beam, 300mm x 300mm x 10mm base plates for bolting to concrete pads supplied by others, 1no 16.800m long gutter to the front side of canopy with 2no downpipe outlets, steelwork to be shot blasted, zinc primed to inter zinc 72, polyester powder coated paint finish to BS 6496 colour White.
Glazing Specification
16mm FastLock glazing system, factory assembled interlocking panels with secondary water management including aluminium flashings to suit, glazed with 16m clear UV protected triple-wall polycarbonate.