Project: 02 City Hall
Location: Newcastle-upon-Tyne, England
Main contractor: Medlock FRB
Specification: 1No 11,400mm x 1,774mm Overall size NLS Mono-pitch NaturalSpan glass rooflight and 11,400mm x 640mm vertical front section, aluminium glazing bar gasketed system with secondary water management including aluminium flashings to suit. Unit supplied with front aluminium box gutter and downpipe for rainwater management. All aluminium polyester powder coated paint finished to BS 6496 colour tint White. Unit fixing to a prepared support frame supplied by others. The unit was provided with 2No electrically powered openers complete with a rain & temperature sensor.
Glazing Specification
28.4 double glazed low e glass units comprising of 6mm “Self-cleaning” toughened obscure outer, 6.4mm clear laminated inner. with 16mm argon filled cavity