Manufacturers of
Rooflights, Structural Glazing,
Canopies & Walkways

Aldersbrook Primary School
NLS Fastlock Ridgelight
Project Description

Project: Aldersbrook Primary School

Location: London, England

Main contractor: Russell Trew Roofing Ltd

Specification: Removal of existing glazing leaving the existing structural supports in place and refitting with 1NO 14.370 x 2.2500m downslope fastlock glazing system, factory assembled interlocking panels with secondary water management and flashing to suit, vertical glazed sides 700mm high at 625mm centres, 8no electrically operated opening vents controlled by temperature and rain sensor with 5 amp control panel, polyester powder coated paint finish BS/6496 colour White.

Glazing Specification

GRP double glazed units comprising of 3mm Georgian wired outer, 3mm class ‘O’ Georgian wired inner.

VIEW PROJECT