Project: Aldersbrook Primary School
Location: London, England
Main contractor: Russell Trew Roofing Ltd
Specification: Removal of existing glazing leaving the existing structural supports in place and refitting with 1NO 14.370 x 2.2500m downslope fastlock glazing system, factory assembled interlocking panels with secondary water management and flashing to suit, vertical glazed sides 700mm high at 625mm centres, 8no electrically operated opening vents controlled by temperature and rain sensor with 5 amp control panel, polyester powder coated paint finish BS/6496 colour White.
Glazing Specification
GRP double glazed units comprising of 3mm Georgian wired outer, 3mm class ‘O’ Georgian wired inner.