Project: Holy Trinity Rosehill Church of England Primary School – Phase 1
Location: Upsall Grove, Stockton-on-Tees
Main contractor: A & J Bennett
Specification: 7,700mm x 3,300mm overall plan size, NLS structural steel mono-pitch canopy, constructed from steel box section uprights (8No CHS), ring beam and cross ties 300mm x 300mm x 10mm base plates for bolting to concrete pads. All steelwork to be shot blasted, zinc primed to inter zinc 72, and polyester powder coated paint finish to BS 6496 colour Traffic white.
Glazing Specification
25mm FastLock glazing system, factory assembled interlocking panels with secondary water management including aluminium flashings to suit, glazed with 25mm UV protected multi-wall polycarbonate colour tint Opal.
If you wish to see Phase 2 of this project, please click the view project button to the right.