Project: Maltby Manor Academy
Location: Rotherham, England
Main contractor: Naturalight Systems Ltd
Specification: 1No 8,250mm x 4,300mm x 2,550mm high to underside of ring beam mono-pitch independent Fastlock steel canopy, constructed from 120mm x 120mm steel box section uprights, cross ties and ring beam, 250mm x 250mm x 10mm base plates for bolting to concrete pads supplied by NLS, guttering to 1no side of canopy with downpipe outlet, all steelwork to be shot blasted zinc primed to inter zinc 72, polyester powder coated paint finish to BS/6496 colour Blue.
Glazing Specification
16mm Fastlock glazing system, factory assembled interlocking panels with secondary water management including necessary flashings to suit, glazed with 16mm bronze UV protected triple wall polycarbonate.