Manufacturers of
Rooflights, Structural Glazing,
Canopies & Walkways

Moorside First School
Fastlock Mono-pitch Canopy
Project Description

Project: Moorside First School

Location: Newbiggin-by-the-Sea, Northumberland, England

Main contractor: Naturalight Systems Ltd

Specification: 1NO 8000mm long x 3000mm wide x 3400mm high to underside of ring beam, NLS 10º mono-pitch FastLock structural steel canopy, constructed from 80 x 80 x 3mm SHS steel uprights, cross ties, diagonal ties and ring beam, 300 x 300 x 10mm base plates for bolting to concrete pads supplied by NLS, 1no 8.000m long gutter to the front side of canopy with downpipe outlet to suit, steelwork to be shot blasted, zinc primed to inter zinc 72, all polyester powder coated paint finish to BS 6496 colour Red & Yellow.

Glazing Specification

Roof

16mm FastLock glazing system, factory assembled interlocking panels with secondary water management including aluminium flashing to suit, glazed with 16mm UV protected triple-wall polycarbonate colour tint Clear.

Side Glazing

16mm FastLock glazing system, factory assembled interlocking panels with secondary water management including aluminium flashing to suit, glazed with 16mm UV protected triple-wall polycarbonate colour tint Clear.