Project: Roding Primary School
Location: Dagenham, England
Main contractor: Naturalight Systems Ltd
Specification: 1No 8,420mm x 4,710mm x 3,675mm high. NLS mono-pitch 16mm FastLock structural steel canopy, constructed from steel 90mm diameter CHS uprights (6no), 80mm x 80mm x 5mm steel box section cross ties and ring beam, 300mm x 300mm x 10mm base plates for bolting to concrete pads supplied by others. All steelwork to be shot blasted, zinc primed to inter zinc 72, all polyester powder coated paint finish to BS 6496 colour Blue.
Glazing Specification
16mm FastLock glazing system to the roof of canopy, factory assembled interlocking panels with secondary water management including aluminium flashings to suit, glazed with 16mm UV protected triple-wall polycarbonate colour tint, Bronze.