Project: Toner Avenue Primary School
Location: Hebburn, Newcastle
Main contractor: Kier
Specification: 17000mm x 3000mm overall plan size + 6300mm x 5000mm x
4600mm triangular section to one end, NLS structural steel mono-
pitch canopy, constructed from steel box section uprights (15No),
ring beam and cross ties 300 x 300 x 10mm base plates for bolting
to concrete pads. Unit supplied with aluminium
box gutter and downpipes for rainwater management.
All steelwork to be shot blasted, zinc primed to inter zinc 72, and polyester powder
coated paint finish to BS 6496 colour Anthracite PPC frame. Canopy supplied with cushion post pads.
Glazing Specification
25mm FastLock glazing system, factory assembled interlocking panels with secondary water
management including aluminium flashings to suit, glazed with 25mm UV protected multi-wall
polycarbonate colour tint